Edit a work in progress (WIP) schedule

Edit WIP schedules as project information changes throughout the reporting period.

WIP schedules created at the top level can only be edited and deleted from the top level.

If the WIP schedule has been posted, you can update only the following information:

  • Comments field at all levels
  • Project manager (PM) forecast fields
  • Finalized field

Unless you revert the previous posting, you cannot refresh the data for a posted schedule or edit the CFO fields that affect the posted General Ledger entries.

  1. Go to Projects > All > WIP schedules.
  2. Select the Report ID of the WIP schedule that you're going to edit.
  3. Optionally, you can import data into some fields. For more information, see Import WIP schedule information.
  4. Enter information in one of the following ways, depending on whether you break down project costs. Learn about breaking down project costs.

  5. When you're finished entering data for a project, select Yes in the Finalized column.

    All projects must be set to Finalized before you can post the WIP schedule.

  6. When you are finished, select Save.

Next step: Post the WIP schedule